h will reduce water usage and drainage load.
A new public space is planned to the north west of the theatre site, with new shrubs planted and seating and lighting installed. A new pedestrian crossing close to the theatre entrance will also be put in place. Transport is also improving. An increase in bus rider-ship increase in recent years and the new transport hub and improved bus station will provide even more choice and improve routes into the town itself, this in effect will cut down emission costs.
The site is in an urban area and benefits from good access to public transportation. The local train station is 400m from the theatre
The accessibility for disabled building users will be optimised with a conveniently located disabled set down position along Exchange Street, lifts designed for wheelchair use, sufficient width to accommodate wheelchair access and automatic door operation where required.
Water metering with pulsed output to the BMS will enable monitoring and minimisation of water use. No, or very little, planting or landscaping that requires irrigation will be provided. The building will cause limited additional load to the drainage system.
A dedicated storage space will be provided for materials that can be recycled (10 m3). Waste produced during construction will be monitored and segregated to encourage waste management and recycling.
Good daylight and views out will be provided by unobstructed windows
Daylight controlled energy efficient artificial lighting will provide additional lighting where required. The cladding panels and windows will be designed to have excellent thermal and acoustic properties to attenuate disruptive noise from the exterior. Fresh air intakes will be placed as far as possible from sources of external pollution such as air extracts, roads, car parking and delivery areas.
Acoustic performance has been considered to ensure minimal transmission of noise both within the development and to/from the adjacent buildings.
All insulation for the building fabric and pipework/ductwork will have an Ozone Depleting Potential (ODP) of zero and a Global Warming Potential (GWP) of less than 5. During construction works, the considerate contractors Scheme will be complied with and best practice will be implemented during construction to prevent pollution to the air, soil and groundwater. As pollution to the groundwater such as the brook next to Aylesbury Theatre, could possibly kill aquatic inhabitants.
The footprint of the new building will largely fall within land previously developed for parking spaces. The stream on the back of the building will be cleaned and turned into an “ecological” area and planted to attract wildlife. The pedestrian path at direct proximity will be diverted to another area. The architecture of the extension is in-scale with the surrounding buildings and therefore will integrate with the overall site composition.
Technologies and Techniques (Criteria E)
the technology and techniques used within the engineered product or service during its development, manufacture and maintenance
The design and the management capabilities reflect the annual investment in
Information Technology.
Information Technology is used in all aspects of the design, drawing and the management of projects, administration and costing, knowledge management and internal communication.
Information technology has contributed to the dev
本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。