英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

加拿大作业assignment写作范文参考

论文作者:英语论文论文属性:作业 Assignment登出时间:2014-09-18编辑:yangcheng点击率:9718

论文字数:3353论文编号:org201409172243458389语种:英语 English地区:加拿大价格:免费论文

关键词:电力部门Economics EssayPower Sector电力委员会私有化

摘要:本文是一篇分析印度电力部门私有化的加拿大作业,在过去4-5年中印度的电力行业发生了巨大的改进,但是前进的道路并不顺利。有许多挑战需要克服,主要是由于面临着在我国的实施问题,实际上就是计划与实施之间存在差距。

加拿大assignment:印度电力部门私有化研究


在过去4-5年中印度的电力行业发生了巨大的改进,但是前进的道路并不顺利。有许多挑战需要克服,主要是由于面临着在我国的实施问题,实际上就是计划与实施之间存在差距。这篇论文强调了其中的一些差距,并试图分析这个问题。我们分析在行业盛行的风险,和克服这些所需的步骤。政府在这个部门的贡献和控制花费巨大,需要非常详细地加以研究。我们学习了奥里萨邦电力委员会的经验,借鉴它是如何实现的结论,并确定在电力部门私有化的未来实现效益的关键教训。 


印度当前情况

整个电力行业,可分为三个部分—发电、输电、配电。截止2009年9月30,印度拥有世界第五大发电能力,在全球拥有装机容量为152 GW容量,2008年7月,全球发电量低于5%。安装印量为为167278.36万千瓦。


Privatization Of The Indian Power Sector Economics Essay

The power sector in India has witnessed tremendous improvements the last 4-5 years, the path forward however isn’t smooth. There are many challenges to overcome mainly due to the implementation problems faced in our country and the gap that exists between what is actually planned what is implemented. This term paper highlights some of these gaps and attempts to analyze the problem. We analyze the risks prevalent in the industry, and the steps required to overcome these. The government contribution and control over this sector has been immense and needs to be studied in great detail. We have then taken the case of the Orissa State Electricity Board and draw conclusions on how it was implemented and also identify the key lessons that would benefit in the future implementations of a power sector privatization.

CURRENT SCENARIO IN INDIA

The power sector on the whole can be divided into three parts Generation, Transmission and Distribution. India has the fifth largest generation capacity in the world with an installed capacity of 152 GW as on 30 September 2009 [1] , which is less than 5% of the global power generation. The installed capacity of India as of July 2008 was 167278.36 MW. The power generation in India is basically fuel based of which thermal power generation dominates. The graph below shows the various means used to generate power and also that thermal power for which coal is a prime input.

2

Though the emphasis has always been there on the power sector through government spending and the five year plans, the implementation of power projects have always been a concern. The planned targets have hardly been achieved. The Indian government has allocated huge budgets and set ambitious goals to achieve in the 11th plan, which if successful could lead to a huge expansion in the power generation. However, over the years we have always seen a mismatch between the planned targets and the achievements. This trend can be observed from the graph below –

3

Already the targets for the first few years of the 11th five year plans have not been achieved. Some of the reasons can also be attributed to the shortage of fuel for generation of power. Even in the transmission and distribution sector there has been investments planned to handle the additional capacity.

DOMINANCE OF STATE AND CENTRAL UTILITIES

There was a general belief that the power sector had to be vertically integrated with the generation, transmission and distribution being controlled by a monopoly player. Since, power was vital for the economic growth, it had to be in the hands of the government. So in India also, the entire power sector was controlled by the government through the State Electricity Boards and Central Agencies. The power sector had a very low share of private players operating. The graph below shows the d论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。