英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

加拿大留学dissertation的写作方法和技巧范文参考

论文作者:www.51lunwen.org论文属性:硕士毕业论文 thesis登出时间:2015-05-01编辑:felicia点击率:20703

论文字数:论文编号:org201504232035017312语种:英语 English地区:加拿大价格:免费论文

关键词:

摘要:加拿大留学论文的写作,都有一定的写作方法和技巧,本文就为大家简单示范一下,希望大家从中学到相关方法

本文是一篇加拿大留学论文,主要调查5号航站楼开放的问题,尤其是行李处理系统,尽管进行了广泛的模拟测试,并征集了二千多名志愿者,但是在这样大型项目上仍然要确保可能出现的风险,并采取相应的策略,希望大家通过这篇文章的学习,能够了解论文写作的要点和技巧,并能够在写作留学论文的时候能够将你的核心内容讲述清楚。


Dissertation Objectives


Investigate the problems at the terminal 5 opening, especially with the baggage handling system despite extensive simulated testing using thousands of bags and more than two thousand volunteers in the run up to the opening of T5


Identify the necessary risk strategies to be considered for such mega-projects, the benefits of such approaches, taking into account previous failed and successful projects, and any lessons to be learnt


Discuss the implementation approach adopted by BAA and the risk associated with this approach


Provide formative evaluation summarising key findings and conclusion based on evidence gathered from research

T5 Synopsis


The terminal 5 project in addition to being a statement of intent for the future of British aviation was built with the aim of improving customer experience and to exhibit Heathrow as a world class international airport. The baggage handling system at T5 was designed to be the largest baggage handling system in Europe for a single terminal. The system consists of a main baggage sorter and a fast track system. The system was designed by an integrated team from BAA, BA and Vanderlande Industries of the Netherlands, with the aim of handling both intra-terminal and inter-terminal luggage. Its processing capacity was intended to be 70,000 bags a day. Bags are meant to undergo several processes on the way through the system, these include; automatic identification, explosives screening, fast tracking for urgent bags, sorting and automatic sorting and passenger reconciliation.


The scheduled completion and opening date was March 2008, and T5 was on time and on budget. This was a remarkable achievement especially in a sector where project delays and vast overspends are commonplace (the Millennium dome, Wembley stadium and the Scottish Parliament buildings were all opened late and cost a lot more than the original estimate). However, on its first day in operation, T5's bespoke baggage system was affected by technical software problems, which led to a number of issues, such as cancelled flights, lost baggage, and substantial delays, but more importantly, BA's challenge were its people issues and integrating teams of staff. Initial reports suggest that the day one issues were less to do with technology issues and more to do with inadequate staff training, and this was not just for one group of people but at all levels. Below is a summary of its problems on the opening day:


Hundreds of staff found it difficult finding the staff car park entrance


Check-in staff struggled with their systems, these problems ranged from very simple tasks such as logging into the baggage system to complex tasks


Security personnel who were totally ignorant of their new roles and had to be taken through new procedures in the morning in front of passengers


Ground staff and crews and ground staff getting lost in论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。

共 1/16 页首页上一页1234567下一页尾页

英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非