摘要:代写留学课程作业-代写coursework作业-劳务承包合同作业-The party awarding: ________________________ (hereinafter referred to as the party a)
The contractor: ________________________ (hereinafter referred to as the party b)
代写留学课程作业-
代写coursework作业-劳务承包合同作业-The party awarding: ________________________ (hereinafter referred to as the party a)
The contractor: ________________________ (hereinafter referred to as the party b)
According to the economic
contract law of the People's Republic of China ", the detailed rules for the implementation of the project and project management practice and the characteristics, party a will entrust party b WaiJia engineering branch disciplines construction. Both sides in line with the principle of equality and mutual benefit, through friendly negotiations, in the original bidding based on relevant documents, sign the following terms of the contract, both parties abide by.
A, contract work scope and content
1. The main propositions and residential building engineering frame project.
2. Construction site technical personnel, the safety and quality of the work of the
assignments clearly content.
3. To hand down the work, and relevant materials shall be after the fight neat, classification piled up on the party a construction personnel provisions of the area. Must be approved signature by the builder by party a, otherwise not to check out.
Second, contracting unit price and settlement
1. According to the basement building area of sight yuan / ㎡, standard according to the building area of sight yuan / ㎡ (the price for province standardized ask price). Unit price includes the Labour, high fees, accommodation, travel, labor protection money into out (helmets, gloves, uniforms, seat belt), small tools (plate hand), auxiliary materials (wire), 5 evidence (temporary residence permits, or certificate, the employment permit, special type, type of accountant) of the management fee and formalities charge, steel tube cleaning fee, WaiJia daily maintenance and repair, hang the safety net, and above all, derrick take work have happened in the content of the artificial cost and personal tax, etc.
2. Monthly 25 by the builder according to quantity, hand in HeSuanYuan check check out, the relevant departments for approval, early next month paid by 10 months of 80% 60% work, WaiJia dismantled the 40% of pay 80%, at the end of the year (Chinese) to pay 10%, the remaining 10% as the safety and quality of margin, wait for a completed project after acceptance, the authorities pay the rest of the bill.
Three, service personnel salary measures
Party b shall prepare a month of a concerned labor cost allocation rules and payroll (must implement to a personal), in every checkout payment after party a financial personnel in before.
Four, party b shall prepare monthly materials ahead of schedule a monthly report to party a's relevant personnel audit, common agreed for material plan, reasonable arrangement of turnover materials, reduce loss, according to the relevant departments, formulate strict construction material loss table control. If more than the calibration (sight %), is part of the original price for more than material.
Five, the responsibility
(a) party a duty
https://www.51lunwen.org/coursework/ 1. Be responsible for the construction of the month, season production plan and work plan, coordinate arrange, ensure the tasks can continuous, reasonable balanced construction.
2. Responsible for on-site construction technical problems guidance and quality supervision, timely communicate in written work instruction, work safety book.
3. Responsible for project turnover materials prompt supply (operation within 500 meters, and should press quot