英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

施工过程中对施工材料、机械设备、混凝土使用等成本控制

论文作者:www.51lunwen.org论文属性:作业 Assignment登出时间:2014-06-09编辑:lzm点击率:4418

论文字数:1305论文编号:org201406091427545001语种:英语 English地区:中国价格:免费论文

关键词:Tunnel construction managementconstruction materials施工材料成本控制

摘要:Tunnel construction management as a major engineering, construction in the process of construction materials, machinery and equipment, concrete use of cost control, quality of construction of the tunnel is to achieve one of the guarantees and social benefits.

Tunnel construction management as an important work of daily management, the construction process of the construction materials, machinery and equipment, concrete use of cost control, quality of construction of the tunnel is to achieve one of the guarantees and social benefits. Therefore, from the construction method to the construction of the various elements of scientific control, improve material utilization and reduce costs caused by the loss of working time phenomenon. 


1 A tunnel Overexcavation control means
 
1.1 construction design to accurately measure the loft during tunnel
construction, when carried out in accordance with the scientific design perfect construction supervision, excavation control the distance to try to reduce the error overbreak errors. This requires the construction sector with more advanced measuring instruments, on the basis of precise strategies to strengthen the sense of responsibility mapping education, the results of the measurement and timely feedback.
 
 
1.2 Measurement results and timely feedback, make adjustments accordingly after blasting tunnel section and pre-construction design loft section have a certain gap, work area design data in accordance with the pre-budget overbreak distance, mostly in the actual cross-section staking program , so the design of cross-section according to a predetermined value for construction control, to go through all of the over and under group give accurate measurement data, and construction captain, construction workers and other agreed, good first-hand information, reported to the technical director and director of engineering work area, to facilitate timely decision-making and management.
 
1.3 pairs of daily consumption of concrete and timely feedback to achieve the measurement data proofreading approved, construction technology departments should strengthen the jet, the tunnel invert, tunnel lining surrounding places such as filling and a good amount of concrete used for accurate strictly controlled, arrange special personnel inspect the concrete daily usage, and timely reported to the construction of district director or technical supervisor.
 
2 tunnel construction schedule management measures
 
2.1 Strengthening excavation process cycle times and footage of the assessment of the progress in improving aspects of engineering, construction area combined with pre-construction experience, the project's actual construction conditions that can develop scientific and strict construction personnel appraisal reward system, each team for tunnel construction implementation of the on-site attendance time requirements, adding emergence of convergence from chain or delay construction of the phenomenon, carried out by the parties and the negative sign and acknowledge the responsibility lies. Strict examination cycle shift construction site personnel situation. Are not allowed to leave early, undergo phenomenon. All the time, and tunnel construction progress of construction to be a reasonable plan for improving the enthusiasm of the majority of construction workers.
 
 
2.2 to improve tunnel construction work area traffic management plan according to the construction program and the overall planning tunnel construction situation in each hole large lay aside a go论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。