英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

航空科技创新设计:Sopwith Aircruiser

论文作者:留学生论文论文属性:案例分析 Case Study登出时间:2010-12-21编辑:anterran点击率:6085

论文字数:1757论文编号:org201012211202355993语种:英语 English地区:中国价格:免费论文

关键词:Sopwith Aircraft IndustriesSACDirectorsprojectnew passenger aircraft

Sopwith Aircruiser 3
Introduction

留学生毕业论文 https://www.51lunwen.org
The Sopwith Aircraft Industries (SAI) has a long tradition of aircraft manufacture. SAC is planning the development of a new passenger aircraft: Sopwith Aircruiser 3 (SAC 3). The SAC 3 is intended to have a larger capacity and offer greater fuel efficiency than the current SAC 2. A number of options have been considered and just two remain as serious possibilities: the radical SAC3a and the SAC 3b which is a more conservative development of the successful SAC 2. Given the well publicised problems with some competitors’ major aircraft developments, SAI have requested a risk analysis of the project and the options.

The programme for the development of the SAC 3 is dominated by design and testing: it is well worth spending more time and money getting the design right, even if it does appear to delay the whole programme. Solving problems later is very expensive. Computer simulations are used extensively at the design stage to explore alternatives and assess the options. Good design should require relatively little modification. However, the stringent safety requirements imply a rigorous regime of testing. Inevitably some modifications will be needed but past experience suggests that these should be manageable and not introduce substantial delays, or additional costs.

If the SAC 3 development is approved by the Board of Directors, work on the project will begin in June 2011.

 
Task

留学生毕业论文 https://www.51lunwen.org

You have been asked as a project management consultant to help SAC assess whether the SAC3 development is financially viable and recommend a project plan. You should produce a report for the SAI Board of Directors in time for its next meeting on 10 May 2010. The report should provide:
• a plan illustrating the logic of the project;
• an assessment of the project’s financial viability, assuming no risk;
• a qualitative risk assessment of the project proposal;
• a quantitative analysis of the schedule risk;
• a quantitative analysis of the financial risk;
• a comparison of the two options SAC3a and SAC3b;
• recommendations to the SAI Board.
A number of interviews have been held with key staff from SAI and these have been
summarised below
.
The SAC3 options
The SAI Board are divided: some support the radial SAC3a option and others the more conservative SAC3b design. The SAC3a should offer greater performance, generating higher sales 论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。