英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

海洋模块钻机分区研究:Module Partition Research for the Marine Drilling Rig

论文作者:留学生论文论文属性:硕士毕业论文 thesis登出时间:2010-12-30编辑:anterran点击率:2882

论文字数:2315论文编号:org201012301530512949语种:英语 English地区:中国价格:$ 66

关键词:modulemodule partitionmarine drilling rigmodular division scheme

Module Partition Research for the Marine Drilling Rig
Key words: module, module partition, marine drilling rig, modular division scheme
代写留学生毕业论文Abstract. The modular design principle is that much more products are composed by fewness module, and the products should be stable, and have high precision, simple structure, and also lower cost based on the customer requirements, therefore, dividing and treating the level, size and number of the module scientifically and reasonably is an important guarantee for the successful modular design. And now the modular design, for the marine work-over rig, and scientifically rational module partition scheme are offered based on the principle and theory of the module design and module division.
Introduction
1 The Module Partition Method for the Mechanical Product
2.Principle of dividing the module for the drilling rig and general layout design
2.1 principle of dividing the module
2]

 
Fig. 1 Generalized module partition process

2.2 Entire allocation design
1) Drilling rig equipment module
2) The support module of work over rig

 
Fig. 2 Modular shorts overall layout diagram

3)Power module
It mainly includes generator, fuel oil tank, slip oil tank, house on duty, extinguishing pry and so on. The arrangement form can be independent, also can be decorated with drilling supporting module layout, depending on that the power module is moving or not.  
4)Bulk material storing module
Independent and the hanging of two kinds module structure form is often used in marine work over rig P – TANK.
5)The intervene problem may be occurred in the upper blocks
The drilling rig module is fixed on the top block, which inevitably exist some mutual influence for the arrangement, and which will be aware of as flows:
3. The module division method for the marine drilling rig
3.1 Dividing module based on the weight
3.2 According to the correlation structure into modules
3.3 According to the function module partition integrity
1). Flow series standards
2). Flow parallel guidelines

 

Fig.3 The building process for the module drilling rig

3). Flow convert standards
 
Fig. 4 The function module for the module drilling rig
4. Summary and recommendations
References
[1] Ding Feng, The status and development trend of modularized drilling rig, China Petroleum Machinery, 09(2008).
[2] ZHONG Weihong,https://www.51lunwen.org
 The Partition and Planning of the Hydraulic Press Based-on the Generalized Modularization Rapid Design, 01(2004).
[3] Xu Tiantian; Structure design of ocean-module drilling machine for XiJiang 23-I oil filed, Ship & Boat, 05(2006).
[4] ZHENG Qing-chun, Model of Mechanical Product CAD/CAPP Based on Flexible Module, Modular Machine Tool & Automatic Manufacturing Technique .02 (2008).
[5] Ding Feng, Discussion on Module Division for Light Removable Offshore Drilling Platform, Oil Field Equipment, 02(2010).

论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。

共 1/1 页首页上一页1下一页尾页

英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非