Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal
英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献
ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter
澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文
小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法
英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查
temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语
经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目
日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题
职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意
论文作者:留学生论文论文属性:作业指导 assignment guidelines登出时间:2011-03-06编辑:steelbeezxp点击率:6022
论文字数:17017论文编号:org201103061157461103语种:英语 English地区:英国价格:免费论文
关键词:AssignmentMechanical Technology
assignment Mechanical Technology
School of Computing, Engineering and Physical Sciences
University of Central Lancashire
BEng (Hons) Mechanical Technology
Assignment 3 – Case study 3
In this assignment, you will have to choose one project which cover either the finance management or risks management.
Before starting the assignment, read carefully the case study. You are required to consider the information given in the case study and to carry out the Activities or respond to the questions. The assignment is limited to 500 words, there is no penalty for larger assignments.
PS: You may use Figures and tables, they are will be not counted in 500 words
Report
Prepare a report to show your responses to the above activity. The report should contain headings of: (Cover Sheet); Executive Summary; Introduction; Analysis, Comments; Conclusions. The report should not be around 500 words excluding pictures, graphs or Tables. There is no penalty for exceeding recommended word count.
Assessment
The report forms the basis of the Assessment using the Learning Outcomes It is to be submitted electronically before 4.00pm on 13/03/2011.
This assignment constitutes 1/3 of 25% of the grade allocated to this module.
Timetable https://www.51lunwen.org/scienceandtech/
Suggested Start 20/01/2011 Completion 13/03/2011.
The penalties for late submissions are as follows: “All assessments submitted late, but within 5 days of the deadline, will be given a maximum mark of 40%. Assessments submitted more than 2 weeks after the deadline will not be marked, and a mark of 0% will
be recorded.” Please be aware of the plagiarism regulations found in the Student Handbook and on the University Academic Regulations, available through the website. (https://www.uclan.ac.uk/information/services/sss/quality/regulations/files/aqa1_acaregs_app09.pdf ).
Project 1 – Earned Value Analysis
We are building a shed. The floor is budgeted at £200 while each side is budgeted at £100 and the roof is budgeted for £300. The plan is as follows: the floor will take 2 days to complete, each side will take 1 day to complete while the roof is expected to come in at 2 days. The floor gets done first, followed by each side and then the roof.
Actual work is done as follows, the floor takes 3 days to build and costs £300, and the first side takes 2 days and costs £150. Then you get on a roll. The next side comes in according to project estimate – 1 day and costs only £50.
We are at the end of day 6, how does our project look?
Project 2 - Earned Value Analysis
You work for a company that manufactures high tech Wind Turbine equipment. You are the project manager responsible for the development of a new domestic type of turbines. The project life cycle is made up of the phases in the WBS below. Each control account plan (CAP) is planned to be completed one after the other. Today is the end of Month 5
CAP Duration Budget
Requirements 1 months £ 20,000
CAD/FEM 1 month £ 20,000
Prototype 1 month £ 30,000
Manufacturing 2 months £ 60,000
Testing 1 months £ 20,000
Using the Project status chart below, calculate EV, etc, at the end of month 5
Task Month 1 Month 2 Month 3 Month 4&nbs本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。