英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

The Cost of Buildings-建筑成本研究 [3]

论文作者:www.51lunwen.org论文属性:课程作业 Coursework登出时间:2014-06-13编辑:lzm点击率:20112

论文字数:7393论文编号:org201406132139297977语种:英语 English地区:中国价格:免费论文

关键词:Cost of Buildings建筑成本Material costs材料成本Doors and Windows

摘要:The building industry and the civil engineering industry together are often referred to as the construction industry, and many firms operate in both sectors, even though their staff and organizations may be largely separate.

g the design phase, design review submittals or status drawing should be issued at prescribed intervals and a set of documents will be sent to the permitting authorities for their review. According to Calin (2003), it mentions that the 90% design submittals should be the completed set of bid documents. At the beginning, the project manager has to determine the frequency of submittals to be prepared and the purpose of these submittals. On the other hand, once changes are needed, it is too late to make the changes during construction. It is less expensive to make the changes before the contract is let. When design is finished, a client may advertise and request proposals for competitive bids or a negotiated contract. Especially when project financing is based on public funds, the competitive bids are required.
Design costs generally equivalent to less than 1% of the construction project life-cycle costs, but it is account for more than 75% percentage of impact on this project. This shows that the design quality of the entire project is essential to the effectiveness of the design phase of the cost control to improve the design quality. But the building design process is a complex relation between skills, judgment, knowledge, information and time.
Calin( 2003) said, the optimum solution is that which is obtained within the constraints imposed by such factors as:
 Statutory obligations;
 Technical feasibility;
 Environmental standards;
 Site conditions;
 Cost.
In design cost, it is difficult to translate all tributes into a common unit value.
The role of the design cost planner is to provide information to the initial and future costs planning, depends on this, the design team can make a clear decision of overhead costs. The responsibility to provide the costs must be the whole team, not only the building estimator. However, the building estimator should be a main contribution people. According to Richard (2007), in theory the team will pool their combined knowledge for the benefit of the client, whose representative should wherever possible be a member of the team and play a part in the corporate decision- making process. As with any group activity, the composition of the team should be carefully planned to avoid vociferous member unduly influencing the final decision. This can influence the whole decision of the team and impact on the final cost of the building.


Chapter 4
CONSTRUCTION COSTS
4.1 The Groundwork and Foundations
Before the construction start, estimators are usually consider all of the drawing details carefully in order to obtain comprehensive information, and then check to ensure that the drawings have been completed and have enough details to ensure that no lack of measurement information. During the start time, sometimes it is possibly to dismantle the existing buildings, the felling of trees, fences and other similar work. These costs are depends on the environmental conditions.
Some contracts involve alterations to existing buildings and these are sometimes termed “spot items” and are normally kept together in a separate section of the bill of quantities possibly headed “Demolitions and Alterations”, with some of the items covered by Provisional Sums, where the full extent of the work involved cannot be accurately 论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。