英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

建筑学留学论文—供热设施在安装过程中的注意事项 [2]

论文作者:www.51lunwen.org论文属性:硕士毕业论文 thesis登出时间:2014-07-17编辑:felicia点击率:17096

论文字数:7194论文编号:org201407171342532438语种:英语 English地区:中国价格:免费论文

关键词:集中供热设施district heating schemeprocurement cost plannetwork of pipes承包商

摘要:这是一篇建筑学留学论文。集中供热系统是新时代建筑业中不可缺少的组成部分,与传统的供热设施相比,现代集中供热系统可以提高成本效益,降低二氧化碳的排放量。本文通过集中供热设施的安装方案的探索,分析安装过程中出现的问题,探讨其相关的注意事项,促进供热系统的不断完善,促进建筑业的不断发展。

s;

To install a district heating scheme to serve 100 pensioners bungalows.

To conduct the feasibility study of CHP/CH for district heating.

To establish contractual and procurement issues that may occur in this project scheme.

To study life cycle costing of the district heating scheme.


CHAPTER 3: FEASIBILITY STUDY OF CHP/CH FOR DISTRICT HEATING SCHEMES

Any CH development, whether new or refurbished, large or small, should start with a feasibility study, during which the technical and economic viability of community heating, compared with other possible options, will clearly emerge. The application of CHP enhances the combined heat option by providing heat and power with a very high overall efficiency. So this section deals primarily with the feasibility of CHP/CH schemes. Options should be compared using sound economic principles, always ensuring that full life-cycle costing is used.


The content of the feasibility study will be far reaching and, in the course of the work, many fundamental decisions will be made as to the technical approach and the most attractive option to be pursued. Once the project development stage is reached it is much more difficult to change course. Consequently the feasibility study needs to be carefully procured, managed and fully discussed before proceeding further.


3.1: Defining the brief

Whether the study is being carried out in-house or using external resources, it is necessary to define a brief. This must state the objectives clearly, and provide information on existing buildings and their heating systems, the general aspirations of the organisation commissioning the study, and the time-scale for the study. Any particular issues of concern should be mentioned, but otherwise the brief should not constrain the scope of the study. If external consultants are to be appointed, their selection should be primarily on the basis of the capability, qualifications and experience of the study team and their approach and methodology.


The study should include engineering, economics, environmental and commercial issues, together with related health and safety matters, for which a comprehensive team of experts needs to be assembled, often with external consultants working closely with in-house lead personnel. An indication of the economic parameters to be used in assessing options should be provided in the brief, e.g. the test discount rate and the period of analysis to be assumed in a discounted cash flow analysis. Such information will be needed during the study, and early discussion and agreement on these parameters is advisable. It is important to insist that the correct basis of full life-cycle costing is applied to each of the options under consideration. Once the main options have been established, capital costs will need to be estimated, as well as operating and maintenance costs where these are the responsibility of the CHP/CH developer.


3.2: Heat and electricity demand Assessment

The starting point of a study is the determination of the market for heat, cooling and power. Initially, this involves enlisting support for a scheme from organisations such论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。