英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

加拿大作业assignment写作范文参考 [3]

论文作者:英语论文论文属性:作业 Assignment登出时间:2014-09-18编辑:yangcheng点击率:9757

论文字数:3353论文编号:org201409172243458389语种:英语 English地区:加拿大价格:免费论文

关键词:电力部门Economics EssayPower Sector电力委员会私有化

摘要:本文是一篇分析印度电力部门私有化的加拿大作业,在过去4-5年中印度的电力行业发生了巨大的改进,但是前进的道路并不顺利。有许多挑战需要克服,主要是由于面临着在我国的实施问题,实际上就是计划与实施之间存在差距。

ternative and more lucrative career options. The Government, which sponsors a majority of the capital projects has not done enough to address this issue. Training the graduates is the most viable option even though this could push up the project costs to a certain extent.

DRIVE TOWARDS PRIVATIZATION

From the above discussion, we can clearly observe the need to try out something different to benefit the power sector and the option available in the sight is privatization. Some of the evident advantages of privatization are –

Implementation issues of power projects could be solved

Technological advancement through increased R&D spend to gain competitive advantage

Increased investment – Foreign investments

Improves revenue realization making the service more efficient

More players to cover up for the deficit

It is usually assumed that private players would execute the projects with greater efficiency and hence, the implementation issues could be resolved. There would be greater investments in this sector to derive the best and gain a competitive edge while making the business viable. Hence, the technology used currently could undergo a revamp and make great advancement through greater spend in research and development. The foreign player who are currently keen on investment in India’s growth story could bring in better technology, investment and the expertise to carry out large power projects. This would also bring in greater efficiency and as a result of privatization we could see greater number of player competing. The power deficit currently faced by the country could be addressed due to the existence of large number of players and also there could be a gain for the consumers through price wars and existence of a competitive market.

PAVING THE WAY FOR PRIVATIZATION

The government has also realized that there is a scope for improvisation and sees the advantages of privatization. Since, this is a heavily regulated sector Government regulations play a huge role in driving the privatization. It has now undertaken some actions that could pave the way ahead for the privatization of the sector and encourage greater investments from the private sector. Some others like the Land Acquisition Bill are yet to be passed but currently facing some political resistance. The reforms taken by the government are –

Electricity Act, 2003 is an historic legislation, which not only integrates the previous three Acts, but goes beyond in trying to create a competitive environment.

Consumer is the central point of this legislation and the main features are:

Promoting competition for benefit of the consumers.

Effective mechanism for redressal of consumers’ grievances

Regulatory oversight for transparency

Measures to control theft of power

Special measures for power in rural areas

Facilitates Investment by creating competitive Environment

Entry Barriers removed/reduced

Generation de-licensed

Freedom to captive generation including group captive.

Recognizing trading as an independent activity.

Open access in transmission already in place.

Open access to consumers above 1 MW within five years commencing from 2论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。
英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非