英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

建筑学留学论文—供热设施在安装过程中的注意事项 [10]

论文作者:www.51lunwen.org论文属性:硕士毕业论文 thesis登出时间:2014-07-17编辑:felicia点击率:17154

论文字数:7194论文编号:org201407171342532438语种:英语 English地区:中国价格:免费论文

关键词:集中供热设施district heating schemeprocurement cost plannetwork of pipes承包商

摘要:这是一篇建筑学留学论文。集中供热系统是新时代建筑业中不可缺少的组成部分,与传统的供热设施相比,现代集中供热系统可以提高成本效益,降低二氧化碳的排放量。本文通过集中供热设施的安装方案的探索,分析安装过程中出现的问题,探讨其相关的注意事项,促进供热系统的不断完善,促进建筑业的不断发展。

nd the IRR must be greater than the minimum required by the energy developer company, taking account of the risks in the project.


It is worthwhile investigating whether any local major consumer, such as a local authority, is willing to connect all their buildings to a scheme. This can reduce the investment risk significantly and improve cash flow. The question of economic viability cannot be separated from an analysis of risk, particularly where project finance is the route employed. It will be necessary to carry out an analysis in which as many of the costs and performance figures as possible can be contractually underwritten before presenting the results to a financial institution for a view on financial viability. 


A sensitivity analysis is of assistance in identifying which of the many parameters are the most important when considering the risk to the economic performance of the scheme, and also for indicating the range of likely outcomes. From this analysis the advantages of obtaining longer-term fuel purchase contracts or heat and power sales contracts can be judged. Some community heating schemes are initially established without CHP, due to the large capital outlay involved. It may, however, be instructive to consider the economics of a boiler-only community heating option so that the benefits of the CHP plant itself can be separately demonstrated.


3.10: Environmental Assessments

A preliminary environmental assessment should form a part of the feasibility study, identifying both the advantages and disadvantages of CHP.


3.11: Health and safety

Any construction project is covered by the Construction Design and Management (CDM) regulations. The aim of these regulations is to ensure that safety issues are considered from the start of the project, and this may include the feasibility stage. It will be necessary to appoint a planning supervisor and to carry out an outline design risk assessment.


CHAPTER 4: Contractual Issues

4.1: Works contracts

The EU Directive is implemented in the main by the Public Works Contracts Regulations 1991 (SI 1991:2680). The basic qualifying threshold is currently set at special drawing rights (SDR). The rules apply principally to building and civil engineering works together with associated activities such as installation work. Public work concessions are subject to a more relaxed regime under the rules.


Following the adoption of Council Directive 97/52/EC on 13 October 1997, amending the EU public sector directives to align with the new Government Procurement Agreement (GPA), all thresholds for the public sector should now be expressed in SDR. Where the value of the contract exceeds the threshold, contracting bodies are required to publish a prior information notice giving the essential characteristics of qualifying works contracts following decisions to approve the planning of works. A contract notice should be published in the Official Journal when offers are sought in relation to a works contract. When inviting tenders, negotiated procedures may be used only in exceptional circumstances. 