英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

建筑学留学论文—供热设施在安装过程中的注意事项 [13]

论文作者:www.51lunwen.org论文属性:硕士毕业论文 thesis登出时间:2014-07-17编辑:felicia点击率:17152

论文字数:7194论文编号:org201407171342532438语种:英语 English地区:中国价格:免费论文

关键词:集中供热设施district heating schemeprocurement cost plannetwork of pipes承包商

摘要:这是一篇建筑学留学论文。集中供热系统是新时代建筑业中不可缺少的组成部分,与传统的供热设施相比,现代集中供热系统可以提高成本效益,降低二氧化碳的排放量。本文通过集中供热设施的安装方案的探索,分析安装过程中出现的问题,探讨其相关的注意事项,促进供热系统的不断完善,促进建筑业的不断发展。

estment appraisal methods employing approved NPV/IRR techniques, acceptable to economists in both local and central government. It is also essential in evaluating the nature of possible future schemes that these should also be approached on the same basis. Any overall analysis should include reference to the following factors:

• operational efficiencies and costs per kWh

• accounting procedures and cost assessments to tenants

• administrative problems associated with housing management

• levels of account ‘arrears’ and cost collection problems

• system breakdowns and condition of boiler plant, underground mains and dwelling internals

• metering implications with regard to future operational costs and efficiencies

• cost quantification of unmetered losses and identification of single pipe loop systems

• cost quantification of any water losses and investigation into water treatment and make-up water meters

• financial effects resulting from systems operating below design capability

• effects of tenant energy conservation on plant loads and efficiencies

• investigation into the effects of the provision of additional tenant controls

• central plant efficiencies and electronic meters to measure heat at the boiler house wall

• evaluation of alternative fuels/refuse-derived fuel (RDF)/CHP, refuse incineration, etc

• possible introduction of pre-payment heat controllers

• existing and future maintenance procedures

• economic appraisal of existing systems in the long term

• availability of resources and possible use of private sector finance.


While several of the items listed may be considered contentious in certain instances it is essential that the implications of both present and future actions should be fully appreciated.


6.2: Investment Analysis

In evaluations of this nature the options include various strategies from merely returning the heating system to a viable operating state through to a situation whereby full financial control can be maintained over the operation of the system and the final option considers removal of the existing system and the provision of suitable replacement systems which would not be based on the principle of district heating.


A common feature of each option is to determine the varying life expectancy of the equipment and components of each of the systems contained within the options, and from this it is possible to determine the overall useful life of each option. The assessment of such life expectancies is an engineering judgement and is based on data issued by the BRE, BSRIA, etc. However, it is clear that to maintain a viable operating system on an ongoing basis, the capital cost profile incurred at the initial refurbishment stage will recur at some point in the future when the system requires a second and subsequent refurbishment(s) and it is important to reflect this in the investment appraisal.


It is important that the scheme owner be fully aware of the basis on which the论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。