英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

工程建设留学论文-工程建设项目延迟的原因和影响

论文作者:www.51lunwen.org论文属性:课程作业 Coursework登出时间:2014-07-14编辑:felicia点击率:12202

论文字数:5131论文编号:org201407130954404927语种:英语 English地区:中国价格:免费论文

关键词:delay of projectconstruction industrymethodconstruction industrycategories

摘要:在建筑业,经常会发生项目延误的问题,致使延误的原因有很多,包括有偿延误和无偿延误,如火灾、洪水、老板指示的变化等延误都是可原谅延误。本文通过建筑项目延迟的原因和影响的分析,探索相应的对策和建筑业的发展。


这一章将讨论建筑项目延迟的类型、原因和影响。除此之外,还将讨论减少建筑业项目延误的应对方法。


1.延误类型

在建筑行业,项目延误的类别决定延迟带来的损害程度。


1.1可原谅的延误

可原谅的延误的定义:可原谅的延迟指的是由于不可预见的事件超出了承包商或分包商的控制。通常,由于公共机构的规格原因造成的下面的事件可以被认为是可原谅的延迟,如火灾、洪水、老板指示的变化,合约图纸的错误和遗漏,异常恶劣的气候等。可原谅的延误可以进一步分为有偿的可原谅延误和无偿可原谅的延误。


1.2可原谅的补偿

有偿迟是所有者或所有者的代理造成的。例如,建筑项目的建筑师后期图纸的制作。可原谅的补偿延迟通常会导致时间扩展,揭露承包商所宣称的残损索赔。在这种情况下,承包商需要承担额外的间接成本,包括外勤人员费用、家庭办公开销和未吸纳的家庭办公室开销。



In this chapter, I will discuss types, causes and effects of delay of project in the construction industry. Besides that, I will also discuss the method to minimize the delays happening in construction industry


1.Type of Delay

In construction industry, there are the categories of delays used in determining delay damage as shown in table 2.1


1.1 Excusable delays

Excusable delay as define a delay that is due to an unforeseeable event beyond the contractor’s or the subcontractor’s control. Usually, based on common general provisions in public agency specifications, delay resulting from the following events would be considered excusable such as fires, floods, owner-directed changes, errors and omissions in the contract drawing, unusually severe weather and etc. Excusable delays can be further classified into excusable with compensation and excusable without compensation.


1.2 Excusable with compensation

Compensation delays are caused by the owner or the owner's agents. An example of this would be the drawings late release from the owner's architect. An excusable, compensable delay normally leads to a schedule extension and exposes the owner to financial damages claimed by the contractor. In this scenario, the contractor incurs additional indirect costs for both extended field office and home office overhead and unabsorbed home office overhead.


1.2.1 Excusable delays without compensation

Non-compensable delays are caused by third parties or incidents beyond the control of both the owner and the contractor. Examples typically include acts of God, unusual weather, strikes, fires, acts of government in its sovereign capacity, etc. In this case, the contractor is normally entitled to claim extension of time but no compensation for delay damages


1.2.2 Non-excusable delays

Non-excusable delays are cause by lack of performance of the contractor on the construction project. This delay can be cause by underestimates of productivity, improper project planning and scheduling, poor site management and supervision, wrong construction methods, equipment breakdowns, unreliable subcontractors or suppliers. Therefore, it is contractor responsibilities to continue their work with no entitlement to claim for extension of time or delay damages until they completed the project. For instance, a contractor failure to provide an adequate material to completed their job.


1.2.3 Concurrent Delay

Concurrent delay is a pro论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。