英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

建筑类留学生论文 走近现代主义建筑设计大师扎哈·哈迪德 [15]

论文作者:www.51lunwen.org论文属性:学术文章 Scholarship Essay登出时间:2014-11-24编辑:Cinderella点击率:21960

论文字数:9070论文编号:org201411192050128679语种:中文 Chinese地区:英国价格:免费论文

关键词:buildingde-constructivistZaha Hadid建筑艺术现代主义

摘要:扎哈·哈迪德,全新的现代主义者建筑设计师,信仰新的结构方式,新视点,重新诠释现代主义的现实性,将多向度透视、快速移动而强烈的造形,和科技性的架构,整合为意象。在国际建筑界享有盛名。

te events on the same day. Zaha Hadid denies the issue was the cause from her ‘bad design' error.Zaha Hadid’s team confirmed what was brief for the building should provide at least 5,000 seats without obscure views of the 10 meters diving stage activity. Referring to the online report from the ‘www.e-architect.co.uk’, as for the spectators who bought tickets for the event, they were never told about the poor seating views upon their purchase. The centre was build with more than 8,000 seats with proper views for the event. An Additional 3000 seats were added in which is more that the brief’s requirement. They mention that the designs of the seating positions, studies of the sightline and most of the layouts were approved two years ago.

 

Despite the interior remains exceptionally gorgeous and the view, providing the additional seats for the center may require to stand-in position from their seating place and it has ultimately affected the spectator’s comfort level from the games. Apart from the criticism of heavy expenses and continuous budget over flows, yet it moves on, validates as the representative civic space that would offer the ideal ‘winning factor’ and the building still signifies the Olympics of events; it bestows some unforgettable distinctiveness of the games but the ‘design blunder ‘caused fewer people watching from the top row seats, than could have offered by the London Olympic Aquatic Centre.

 

Case Study (4) (Comparison)

 

The top designers at in the Beijing Olympics, the comparison of the Zaha Hadid Architect’s London Aquatics Centre and the Hopkins Architect’s Velodrome and now they struggle for recognition and appreciation in Great Britain. The Velodrome was build at a low hill area, far away from the other sports arenas, not realizing it and without a thought, replacing the open outdoor cycling track was popular among the public. The building was made for this long term purpose, with an additional of 7 kilometers outdoor track to cover for the post-Olympic games, the Velodrome for the indoor events and cycling course will be part of this velopark. The Hopkins director, Mike Taylor was working for this project described a housewarming party for the Olympics would be organized in a café and putting the café in the concourse will be the minimal adjustment for the building.

 

The centre was built with two pools for competition purpose; the 50 meters race pool and a 25 meters diving pool were placed in the main hall where the spectators from the sides will enter the stands, under the entrance forecourt, a 50 meters training pool for the Olympics. The permanent seats located at the side of the competition pools, a mechanical plant and changing rooms located at the floor below the pools. The arena is in a concrete base, clear-cut and logical to its arrangement. Once the temporary stands detached, the glass walls will lift up to its distinctive characteristics. It is also the main focus of this design and most likely can be seen from the outside, the ‘dripping liquid’ from the roof. It’s pleasant论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。

英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非