英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

澳大利亚it作业:Individual case study 个案研究 [3]

论文作者:留学生论文论文属性:案例分析 Case Study登出时间:2013-12-13编辑:anne点击率:12915

论文字数:3350论文编号:org201312130917375487语种:英语 English地区:澳大利亚价格:免费论文

关键词:澳大利亚it作业Individual case study个案研究

摘要:案例研究模拟了一个项目管理方案,其中学生需要在项目经理的角色。此案的资料不完整,以便在有需要的学生将不得不做出的假设和/或从他们的导师/讲师那里得到帮助。

nd setting to work of portable data entry system would take two weeks to prepare. 
Whiz also felt it would be desirable to advertise the tender at least twice, one week apart. Further, his enquiries revealed that it would be advisable to leave the tender open for three weeks and allow two weeks to evaluate the tenders. Whiz's experience with Council told him to allow a further three weeks for Council approval. One day was to be allowed for the installation of the software on the personal computer that was required as an integral part of the system. The software was to enable uploading and downloading of data necessary for the readings. 
 
At the same time, the engineering group made similar enquiries about the supply, delivery and installation of the water meters. The engineers estimated that the required specification would take four weeks to prepare. A condition of the specification was that the successful contractor must have forty people available for the installation of the water meters.  Note that all the water meters must be installed before the new revenue system goes live. It was also thought advisable to advertise the tender twice, on the same basis as Whiz proposed for the portable data entry system. However, the engineering group decided that their tender should be left open for five weeks. They expected the evaluation of the tenders to take three weeks and approval from Council another three weeks. From the evaluation, the engineers estimated that each employee of the successful tenderer would be able to install five water meters per day. 
 
In the meantime, following the initial staff training on the overview of database technology, the project group deliberated for two weeks on aspects of the existing system. They identified those parts that were functionally good and other parts that needed improvement. A further two weeks were spent considering functions that were desirable but which were not provided in the present system. During this period, the group also selected two user representatives and one information technology staff member to visit three other local government councils who had recently upgraded their systems. These councils were carefully selected, as one had recently upgraded their system, whilst another had installed a package and then had it customised to meet their requirements. 
 
As a result of the site visits, the group identified features that would be highly desirable in a new system. In addition, they realised that their existing data would not be suitable for straight conversion in to the database. 
This was because current names and addresses were free formatted whereas it seemed desirable for these to be in a fixed format. In addition they realised the desirability of the data being normalised within the database. 
 
On the basis of the above investigation, the group decided that the best approach would be to go for a package and then customise. The specification was prepared and tenders called. Some other new features included in the specification were: 
 
1. The ability to group water assessments for administrative purposes. 
2. Within each of these groups, the ability to gather assessments for meter reading purposes, and specify the route to be taken when the water meters were being read. Provision was also to be made for alteration o论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。