Singh, S., Kumar, R.,Garg, D. (2003) 'JIT in Service Sector'.Productivity. 43(4): 594-602
Harber, D. (1990) “Just-in-time and the issue of implementation”.International Journal ofOperations & Production Management. 10(1): 21-30
Hayes, R.H., and Pisano, G.P. (1994) 'Beyond World Class: The New manufacturing Strategy'. Harvard Business Review. 72(1): 77-87
Hollocks, B., 1992. A well-kept secret? Simulation in manufacturing industry reviewed. OR Insight 5(4): 12–17.
Hopp, W.J., Spearman, M.L. (2004) “To pull or not to pull: what is thequestion?”.Manufacturing and Service Operations Management. 6(2): 133-148
Jostein, P. (2009) “Defining lean production: some conceptual and practical issues”. The TQM Journal. 21(2): 127-142
Justin, M. Lancaster. (2011) “Lean and Six Sigma in Hospitality Organizations: Benefits, Challenges, and Implementation”. University of Nevada, Las Vegas.
Kevin, D. (2002) “Simulation Research Methods”.Companion to Organizations.Joel Baum (ed.), London, Blackwell.
Koregaonkar, M.G., (1992) Just In Time Manufacturing. Macmillan India Limited, Delhi.
Lars Holst. (2001) Integrating Discrete-Event Simulation into the Manufacturing System Development Process: A Methodological Framework. Division of Robotics. Lund
Law, A., and D., Kelton. (1982) “Simulation Modeling and Analysis”. (NY: McGraw-Hill)
Manoochehri, G. H. (1988) “JIT FOR SMALL MANUFACTURERS”. Journal of Small BusinessManagement. 26(4): 22-30
Maike, S., Boyleb, A.T.,Deflorina,P. (2009) “Lean, take two!Reflections from the second attempt at lean implementation”.Business Horizons.52(1): 79-88
Michael, A. Lewis. (2000) “Lean production andsustainable competitiveadvantage”.International Journal of Operations &Production Management.20(8): 959-978
Master of Science Thesis in Automotive Engineering Programme
NICOLAS, B. (2011) “Lean implementation in service organization-How lean can help improving consultant performancesat Capgemini Consulting”. Chalmers University of Technology.Göteborg, Sweden.
Monden, Y. (1983)Toyota Production System: A Practical Approachto Production Management.Industrial Engineers and ManagementPress. Norcross, GA.
NitinUpadhye , S. G. Deshmukh , Suresh Garg. (2010) “Lean Manufacturing for Sustainable Development”.Global Business and Management Research: An International Journal.
Paul, H. and Suresh, B. (1997) 'Effect of integrated manufacturing strategies on manufacturing performance: A study on some European Multinationals'. Proceedings of International Conference on Management of Technology. ICMOT' 97: 405-413
Rachna Shah,Ward,T.P. (2007) “Defining and developing measures of lean production”.Journal of Operations Management. 25(4): 785–805
Radnor, Z.J., Boaden, R. (2008) “Lean in public services – Panacea or paradox”. PublicMoney and Management. 28(1): 3-7
Radnor, Z.J. and Bucci, G. (2007) Evaluation of Pacesetter, Lean, Senior Leadership andOperational Management within HMRC Processing. HMRC, London.
Radnor, Z.J., (2010)Review of Business Process Improvement Methodologies inPublic Services. Advance Institute of Management. London.
Robinson.S (2004). Simulation - The practice of model development and use. John Wiley & Sons. New Jersey.
Rinehart, J., Huxley, C., Robertson, D. (1997) Just Another CarFactory?.Cornell University Press. Ithaca, NEW YORK.
Ru
本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。