英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

英国管理本科毕业论文 [25]

论文作者:www.51lunwen.org论文属性:本科毕业论文 Thesis登出时间:2015-06-03编辑:felicia点击率:30240

论文字数:15571论文编号:org201505262313039095语种:英语 English地区:英国价格:免费论文

关键词:

摘要:对于一个企业而言,工作中掌握良好的工作方法可以有效提高工作效率和工作质量,推动企业的发展。这篇文章就围绕工作方法进行具体阐述。

g time is made during the start of the operation and at the end of the operation. Clocking time is used to find out the total time used by each operator to complete his/her task. All the 13 operations in total take an average time of about 70 hours. In due course this time has increased from 70 to 90 hours and the operation has gone out of control. If there is an increase in time it would be very difficult to track the reason for the increase in extra time. It may be very difficult to say in which operation the program has gone out of control.


In order to have a control and an understanding such that which operation could have gone wrong and in what point could help us target the problem very easily. So it is decided to divide the operator clocking time into two. As observed the pocket operation takes a long time, so the clocking time is divided as before the pocket and after the pocket.


By this way even after months of production of a part, we can backdate and could identify the time taken for the pocket operation alone. This could help us to keep the process under control and the improvement is not lost in due course. The update in all the CNC programs and routing would play a commendable role to sustain the change.


4.10 Other Improvements


The improvements in the third operation in the part in the bottleneck machine helped to reduce the confusion and to meet the standards in the cell. The improvements were not stopped when an opportunity was seen in any operation. The second operation in the same bottleneck machine took a lot of time to turn down the OD.


Conventional carbide inserts were used for this operation. The depth of cut for this operation was very high and the process usually takes 7 hours to complete roughing the OD operation. The number of passes as per the program was 2 to complete the operation, but due to insert failure the number of passes required to complete it has been increased from 2 to 4 passes.


To solve this problem and to reduce the time in the operation new ideas were implemented. All new ceramic inserts were ordered for this purpose as the ceramic inserts are capable of running at high speeds thus reducing expensive machining times.


Turning is an almost ideal operation for ceramics. In general, it is a continuous machining process that allows a single insert to be engaged in the cut for relatively long periods of time. This is an excellent vehicle to generate the high temperatures that make ceramic inserts perform optimally.


The time taken to complete one single pass in the turning operation with this new insert takes only 17 minutes, but where as in the old method the time taken to complete it is about 2 hours. Although the new ceramic insert was able to perform extraordinarily well it is recommended to have an insert check in every half pass so that the process is under control and the change could be sustained. The depth of cut used for this operation is 100 thousandths per side and the feed is maintained at 10 thousandths, roughing speed at 500 SFM and the final finish speed is at 600 SFM.


This change helped to save 70% of the论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。