英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

英国管理本科毕业论文 [27]

论文作者:www.51lunwen.org论文属性:本科毕业论文 Thesis登出时间:2015-06-03编辑:felicia点击率:30233

论文字数:15571论文编号:org201505262313039095语种:英语 English地区:英国价格:免费论文

关键词:

摘要:对于一个企业而言,工作中掌握良好的工作方法可以有效提高工作效率和工作质量,推动企业的发展。这篇文章就围绕工作方法进行具体阐述。

management and lean experts, with clear responsibilities and boundaries,

Detailed work plans are created,

Metrics are tracked,

Progress is reviewed,

And the system is stabilized.


4.13 Current State Map


Once a strategic value stream has been selected, a team is formed and charted to map the current state. This team should consist of person from the area being mapped, along with any support personnel (such as manufacturing engineering, design engineering, facilities, customers, or lean coordinators) that may be desired.


The objective of the current state map is to walk the process from customer to supplier in order to identify all process steps, process step metrics (cycle time, process time, and change over time, number of people required, number of shifts, reliability, inventory, and information flow. This sets the stage for creating the future state map- in the next step.


Frequently, the current state value stream map will reveal the inefficiencies of the existing production process. These inefficiencies are sometimes a result of unreliable machines, long setup times, and the use of batch and queue production processes, typically leading to large amounts of inventory between each process step and long production lead times (Seth and Gupta 2005).


The “lead time ladder” at the bottom of the value stream map attempts to quantify the amount of processing time required at each step (on the lower steps of the ladder) and the amount of lead time ahead of each process step based on the inventory ahead of each process step (the upper steps of the ladder). By summing across the lower steps and upper steps, the team can get an indication of the ratio of total production lead time. Often, this ratio is very low, indicating a high amount of non-value added activity in the system


The problems in the current cell are mapped in a value stream with the help of IGrafx flow charter software. It is a very user friendly software available for analyzing a process and for modeling the system. It helps the organization to understand the current scenario in a very visual way. From the value stream map the bottleneck situation is analyzed and the overall lead time is reduced for the product.


4.13.1 Background


The current value stream map was already designed by the management as some initial lean techniques were implemented in the cell prior to this work. The problems in the current cell are mapped in a value stream with the help of IGrafx flow charter software. It is an user friendly software available for analyzing a process and for modeling the system. It helps the organization to understand the current scenario in a visual way.


The changes and improvements made in this work helped to achieve the targets in the future state map by reducing the lead time. The new techniques used in this work were updated in the current state value stream to make the journey of lean continue to achieve the ideal situation. With the help of the current value stream map the need for throughput increase, quality and delivery time is un论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。

英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非